SCE BIO Installation - cleaning wash water before sewer discharge

Large Equipment Dealer Cleans Their Water Before Discharge

When a large heavy equipment dealer needed to clean up their wash water before discharging to sewer they chose SCE. We designed a system that would automatically adjust pH, biologically treat the waste stream to reduce hydrocarbons and filter the water to reduce suspended solids.

Using the SCE Bio 20D Discharge system, with all aluminum construction and automatic digital pH control, paired with a zeolite media filter skid solved the issue and has been performing great since day one. The SCE Bio system tank and filter automatically purge and backwash daily for lower maintenance costs.

Call us to design your next wash rack project by emailing us at info@sceclean.com or calling us at (800) 635-4903. Its a dirty world. We can help.